Telephone

0592-6092288

Telephone

0592-6362688
Current Location:HomePage> Cases

Tube Sheet Project


    Project 1; Xiamen Rail Transit Line 4 Project Bid section 2nd of general contract for civil construction--Houxi station to Xiamen North Station, total length is 1001.353 meter. The shield method is adopted by China Construction Sixth Engineering Bureau. A total of 1.5 meter tube sheets 1336 rings are used and produced by our company.

     Xiamen Rail Transit Line 6 Project Bid section 1st of general contract for civil construction


    Project 2: Xiamen Rail Transit Line 6 Project Bid section 1st of general contract for civil construction from Maluan Bay Central Station to Jimei Island Station, with a total length of 4,263.098 meter, which was constructed by China State Construction Strait using the shield method. It is constructed by shield method with 1.2 meter tube sheets and 6350 rings, which are produced by our company.